HOW IT WORKS

One Team, Managing Every Step of Your Project

THE PROBLEM

The Hardest Part of Managing an Overseas Project Was Never Finding Materials

Managing a renovation or construction project from overseas usually means coordinating architects, material suppliers, freight forwarders and inspectors all at once — across time zones and languages. One delayed shipment or one mismatched batch of materials can derail the entire schedule.

That’s why we exist: one team that manages design, procurement, quality inspection, shipping, installation and after-sales for you. You don’t have to be the project coordinator yourself.

Design rendering of bedroom with corner study and wardrobe wall — WUMEI
OUR PROCESS

Our Process in Four Stages

From design to after-sales — 10 specific steps, organized into 4 key stages.

Planning & Design

Design Support · Quantity Takeoff · Material Estimation Architecture, interior, MEP & landscape teams help with material selection; precise quantity takeoff from your drawings; quantities calculated to control budget

Procurement & Quality Control

Factory Audit · Quality Inspection · Procurement Supplying factories are vetted; three-stage quality inspection; volume sourcing for contractor-level pricing

Loading & Shipping

Container Loading · Shipping Professional loading plans protect materials in transit; international logistics with customs documentation support

Installation & After-Sales

Installation Guidance · After-Sales Technical guidance to reduce on-site errors; arrival inspection, issue resolution, restocking coordination

How it works

The Team You Can Trust With Your Entire Project

All 10 steps, each with a dedicated person in charge.

Step 1

Design Support

Architecture, interior, MEP & landscape teams help select materials

Step 2

Quantity Takeoff & BOQ

Accurate quantity takeoff from your design drawings

Step 3

Material Estimation

Precise quantities — no over-buying, no shortages

Step 4

Quality Inspection

Three-stage inspection: pre-production, in-production, pre-shipment. Use our quality control checklist for overseas projects.

Step 5

Factory Audit

Vetting of supplying factories’ credentials and capability

Step 6

Procurement

Volume sourcing for contractor-level pricing. Follow our 5-phase sourcing checklist.

Step 7

Container Loading

Professional loading plans to protect materials in transit

Step 8

Shipping

International logistics coordination, cargo tracking, customs documentation support

Step 9

Installation Guidance

Technical guidance to reduce on-site errors

Step 10

After-Sales Service

Arrival inspection, issue resolution, restocking coordination

Design rendering of Double Queen hotel room, alternate view — WUMEI
Payment Questions

Frequently Ask Questions

Q: Will the delivered materials differ from the samples?

A: We run three-stage quality inspection — pre-production, in-production and pre-shipment — so problems are caught before goods arrive, not after.

Q: How long from order to delivery?

A: Based on the specific materials and quantities, we give you a lead time early in the project grounded in real production and shipping cycles — not an optimistic estimate.

Q: If something goes wrong, is there a single person to contact?

A: From BOQ to after-sales, the same team follows your project end to end. You'll never be passed between different contacts who can't help.

Q: Are you a factory or a trading company?

A: We're a building-material supply-chain integrator. We focus on choosing the right materials, managing factories and ensuring projects land as designed — which is why we can supply whole-house custom, flooring, tiles, doors & windows and more from multiple categories at once.

Q: Can I buy materials only, without design support?

A: Of course. Of the 10 steps, you pick which ones you need us for — it's not a forced bundle.

Ready to Start Your Project?

Tell us your project type and scale — we’ll reply with a solution outline within 24 hours.